Skip to content
Find The Needle
Powered by Pagefind
Find The Needle guides

Find The Needle scanner routing: where each gate goes

Place every Find The Needle scanner after the last packaging machine and before the first split that can reach the stand, on V16.4 split steps and scrap doors.

Practical guide

Routing advice follows patches V15.4 and V16.4 (November 2026), including splitter names, the scrap door fix and the 5% split steps. Scanner throughput is not published.

11/2/2026 Last updated: 11/16/2026 4 min read
Yard of machines and belts with a scanner on the route to the sell stand
Every route that ends at the stand needs a gate in front of it. Image © Needless Games. Image source

Where does the scanner go?

After the last machine that can seal a needle inside something, and before the first junction that can reach the stand. A gate on the incoming side, a belt that only passes nearby, or a branch after the split leaves at least one route where a packaged needle sells unseen.

The route, in order

Step What is on the belt What the gate sees
1 Loose hay leaving the pile The needle is loose; packaging is what hides it
2 Product inside a press, wrapper or Silo A needle can be sealed in here
3 Finished product on the output belt The only place a gate is decisive
4 Splitter toward the stand, the Depot or an order Anything that skips step 3 is gone
5 Selling Stand or order truck A sold needle returns to the pile

Which split is which?

Part Role Note
T Junction First splitter card, $60 Old saves with splitters get it free
Y Splitter / Y Joiner The renamed belt splitter and joiner Unlock after the T Junction
Compact Splitter / Joiner Smaller pieces Open with the Wire and Cores order
Smart Splitter Sends each kind of item to its own door Shows door numbers while you look at it
Split Ratio card 5–95% one-way split in 5% steps (V16.4) Splitters and joiners can hang in the air

The V15.4 fix that matters for a scrap-heavy line: a smart splitter sends a scrap heap out of its Scrap door instead of stopping the line. Before that, one stray horseshoe could stall a whole route (scrap metal and the Smelter).

What about the Depot?

A Depot can sit between the line and the truck, and each Depot keeps its own list and its own KEEP UP TO limit. Two rules follow:

  1. A gate must still be before the Depot, because a Depot holding packaged goods is another place a needle can wait.
  2. A Depot with no belt after it now drops what it cannot hold rather than selling it, so overflow does not silently bypass a gate.

The inventory side is on Depot and drones.

One gate per packaging machine

Two packaging machines sharing one gate only works if their outputs merge before it. If each has its own route to the stand — which is what happens once you run two product lines — each needs its own gate, on its own output.

The Silo is usually built away from the spine, so treat its output as its own route. A hay wad can hold a needle.

When the scanner becomes the bottleneck

Belts queue, the machines behind report full outputs, and the stand starves while the pile is full. Three fixes in order of cost:

  1. Move the gate later. Scan finished product, not wads, so fewer items pass.
  2. Add a parallel gate rather than pushing everything through one machine.
  3. Buy the speed. Scan Batch Size and Scan Cycle Speed levels 1–3 open with Scanner Mk I, and levels 4–5 cost $2,000 and $5,500.

Do not respond by removing the gate. A sold needle returns to the pile, which is slower than scanning it.

Checking a route without a needle in hand

You cannot see a needle inside a package, so test the route instead of the result:

  1. Follow one item from the packaging machine to the stand, on foot.
  2. At every junction, ask which way a needle-bearing item could go.
  3. Confirm each of those ways passes a scanner, not just the main one.
  4. Watch the scanner while product passes; the panel shows what it is doing.
  5. Re-run the check after every splitter, joiner or new product line.

If the yard has stopped rather than leaked, work through troubleshooting — the fault is usually upstream of the gate. The count itself is on scanners and needles, and the first-yard shape is on first factory layout.

Related Articles

Was this helpful?