The Hay Excavator chews a marked zone onto your belt, and the Skyline Crane digs twice as fast when you drive it yourself instead of using AUTO DIG.

Practical guide

Unlock orders and digging speed follow patches V14.1, V15.4 and V16.4 (November 2026). Dig rates, zone sizes and crane costs are shown in game.

11/11/2026 Last updated: 11/16/2026 4 min read
Large machinery working the hay pile in Find The Needle
Once the pile is a wall, digging becomes a machine problem. Image © Needless Games. Image source

FAQ

When do I get the Hay Excavator?
With the Pulp order on V15.4, which places it in the third stage alongside pulp and paper production.
Is driving the crane better than AUTO DIG?
Yes for speed: V14.1 made manual driving dig up to twice as fast as AUTO DIG. Automatic mode is for when you have other work to do.
Why does my excavator stop on its own?
It waits when the receiving belt is full. Clear the downstream line rather than moving the excavator.

When do machines take over digging?

When the pile becomes a wall rather than a mound. Before that, arms and rakes do the work; after it, you need a digger that removes volume instead of nibbling edges.

Two diggers exist, and both arrive late enough that you will already have a factory worth feeding.

What does the Hay Excavator do?

Mark out a dig zone and its auger chews into the pile, one wad at a time, onto your belt. It waits when the belt is full.

That waiting behaviour is the important detail. An excavator does not jam or destroy the load; it stops feeding until the line clears, so a stalled belt downstream looks exactly like an excavator that is doing nothing. Check the belt before you move the dig zone.

V16.4 gave the excavator two cards of its own — Excavator Auger Speed and Excavator Auger Width — and made its belts run as fast as it digs. The same build fixed a bug that matters to anyone hunting late: the excavator no longer leaves needles standing in the hole it digs.

It opens with the Pulp order, in the third stage, alongside the machines that finally use pulp at volume (production stages).

What does the Skyline Crane do?

It is the last digger in the game: set its zone, or take the controls and drive it yourself. It opens with the Sugar order, at the start of the fourth stage.

The V14.1 note is the one worth memorising: driving it yourself digs up to twice as fast as AUTO DIG. Manual mode is not a novelty; it is the fastest digging in the game, at the cost of your attention.

Mode Speed When to use it
AUTO DIG Reference rate While you are building, plumbing or fixing power
Driven by hand Up to 2× AUTO DIG When the line is starving and you have nothing else to do

Crane sections also take a hay rod each — one, not two, since V15.4 — and the claw and winch levels are among the few upgrades that still cost parts rather than money alone (tech tree).

Both machines are lethal to walk into. V16.4’s own wording is “stay away from the Hay Excavator’s auger and the Skyline Crane’s claw — Bubba is not hay”, and the same build stopped a hit from respawning you inside the machine over and over, which used to turn one mistake into a loop.

How do diggers change the yard?

They make the pile face a machine zone rather than a player zone.

  1. Give the digger its own belt run into the spine, so a full belt does not stop the whole factory.
  2. Keep the zone inside your power and pipe layout — a digger at the edge of the yard still needs a cable (conveyors and power).
  3. Do not build over the dig zone. The pile retreats; the floor you built on becomes a ceiling.
  4. Expect more scrap, not less. Deeper pile means more metal on the belt, which is a sorting problem before it is a smelting one (scrap metal).

Which is better: more arms or a digger?

Arms are precise and cheap; diggers move volume. The useful split is:

Job Tool
Feeding a belt from the pile face Arms and rakes
Clearing a zone fast Hay Excavator
Feeding a very large factory Skyline Crane, AUTO DIG overnight, driven when you are watching
Hunting the last needles Metal detector, by hand (scanners and needles)

One warning from the changelog that is easy to miss: the needle bonus stops growing after the second ending, so a yard built around absurd machine speed will not keep accelerating run after run (pile sizes).

Machine roles are collected in the machines index, and the stage that unlocks each digger is on production stages.